Friday, 27 March 2009

Construction part 1 - Initial Photography

The main filming for our coursework was one of the most time consuming processes we have used throughout this project, and a large amout of thought had gone into it.

Before we had even started filming we were faced with a number of problems. Our main problem was as a result of the problem we mentioned in the planning section, which was because we had to change locations after we had taken our photo's for the preparation for the filming, the second house we filmed at was completely different than the first, some of the shots used in the filming were different to those in the photos. However we had to improvise, and make do with what we had, which is what we did, and we filmed it pretty easily after we solved this problem. Another problem we faced was that the light changed very rapidly, which at the time, we thought it would be a major problem, but after editing we noticed that it weren't as bad a we first thought.

We made sure we filmed more than enough, to make the editing easier, and to also add a safety net for our work, because if one of our shots weren't very good, we would have had a few more to work with.

No comments:

Post a Comment